English
Home > About Us >Technological Process
  • All the raw materials of seamless steel tubes and coupling bar stocks that we use come from the large and famous steel manufacturing mills/enterprise in China;

    1

    Bar Coupling Stock

  • According to the product specifications, in strict accordance with the inventory system for raw materials import base cutting saw;

    2

    Cutting

  • The blank rough turing on cut parts is made on plan lathe, processing to meet the requirements of outside diameter and length;

    3

    Rough Maching

  • According to the requirements of the drawings or contracts/orders, use CNC to machine standard and precise workpieces.

    4

    Maching

  • Use magnetic particle inspection machine on the processing of the workpiece to do nondestructive testing, testing whether there is a crack or scar;

    5

    Magnrtic Inspection

  • Measurement and inspection are done according to the production requirements of each process, and with a complete inspection records.

    6

    Inspection

  • Using high temperature phosphating process, improve the phosphating film adhesion and the anti-corrosion ability of the product;

    7

    Phosphate Coating

  • Use the automatic-painting line that our company own researched and developed on the workpieces surface painting, Conveniently and quickly;

    8

    Marking&Painting

  • Usually couplings are packed by pallets and pup joints by bundles and steel frames, using automatic packing machine and pallet packaging film, which are moisture-proof and anti-impacting;

    9

    Packing

  • After specialized and professional factory inspection, using the trucks, rail, air transport, sea/ship transport and so on, by the integrity and stability of the transport chain to ensure timeliness of product transportation.

    10

    Delivery